3 Stand-Alone Commissioning
About This Chapter
This topic describes how to commission the stand-alone UA5000 after the hardware installation
so that the stand-alone UA5000 can work in the normal state.
1. 3.1 Checking the Settings of Jumpers and DIP Switches
This topic describes how to check the settings of the environment supervision circuit (ESC)
board, fan EMU jumpers and dual-in-line package (DIP) switches so that the settings
conform to the actual application.
2. 3.2 Powering On the Indoor Device
This topic describes how to power on the indoor device to ensure that each board is supplied
with power in the normal state.
3. 3.3 Powering On the Outdoor Device
This topic describes how to power on the outdoor device to ensure that each board is
supplied with power in the normal state.
4. 3.4 Commissioning the Power System
This topic describes how to commission the reliability of the power supply system so that
the system can supply the power to the device in the normal state.
5. 3.5 Logging in to the System
This topic describes how to log in to theUA5000 and then commission the UA5000 through
the maintenance terminal.
6. 3.6 Checking the Software Version
This topic describes how to check whether the version of the running software meets the
requirements for office deployment.
7. 3.7 Adding a Shelf
This topic describes how to add a shelf (including the master shelf and the slave shelf) to
ensure the normal running of the shelf.
8. 3.8 Configuring the Board
This topic describes how to check whether the inserted board is the same as the board
required in the data plan and check whether the board runs in the normal state.
9. 3.9 Loading the Script
This topic describes how to load the script file to configure the basic data of the device,
which is a preparation for the commissioning of the basic functions of the device.