2 Commissioning Preparations
About This Chapter
This topic describes how to prepare hardware, software, tools, and data properly to ensure that
the commissioning is implemented normally.
2.1 Hardware Check
This topic describes how to check the hardware before the commissioning. Make sure that the
hardware is available and check the hardware before the commissioning to facilitate the
subsequent operations.
2.2 Software Requirements
This topic describes the software requirements for the commissioning. You need to prepare the
commissioning software before the commissioning to facilitate the subsequent operations.
2.3 Tool Requirements
This topic describes the tools required for the commissioning. You need to prepare and check
the required tools before the commissioning to facilitate the subsequent operations.
2.4 Data Requirements
This topic describes the data requirements for the commissioning. The information about
hardware configuration, networking, and data plan must be available for data configuration.
UA5000 Universal Access Unit Product
Commissioning Guide-PVM CLI 2 Commissioning Preparations