EasyManua.ls Logo

IBM 6C1 - Page 105

IBM 6C1
377 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Table 1. Service Processor Checkpoints. (continued)
Checkpoint Description Action/ Possible Failing FRU
E023 Accessing memory card VPD Replace the memory card
Location: P1-M1
E025 Service processor accessing VPD. Replace the system board.
Location: P1
(See note 3 on page 115.)
E026 Service processor accessing VPD. Replace the system board.
Location: P1
(See note 3 on page 115.)
E030 Beginning to build I
2
C resources 1. Replace the processor card.
Location: P1-C1
2. Replace the system board.
Location: P1
(See note 3 on page 115.)
E031 Finished building I
2
C resources Replace the system board.
Location: P1
(See note 3 on page 115.)
E032 JTAG self-test Replace the system board.
Location: P1
(See note 3 on page 115.)
E040 Starting serial port tests Replace the system board.
Location: P1
(See note 3 on page 115.)
E042 Configuring serial port 1 Replace the system board.
Location: P1
(See note 3 on page 115.)
E043 Configuring serial port 2 Replace the system board.
Location: P1
(See note 3 on page 115.)
E044 Preparing to set serial port line speed Replace the system board.
Location: P1
(See note 3 on page 115.)
E045 Preparing to disconnect serial port Replace the system board.
Location: P1
(See note 3 on page 115.)
E050 Reading system VPD Operator panel.
Location: L1
(See note 2 on page 115.)
Chapter 4. Checkpoints
87

Table of Contents

Related product manuals