EasyManua.ls Logo

Juniper MX204 - MX204 Site Preparation Checklist

Juniper MX204
191 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
MX204 Site Preparation Checklist
The checklist in Table 17 on page 53 summarizes the tasks you must perform when preparing a site for
router installation.
Table 17: MX204 Site Preparation Checklist
DatePerformed byFor More InformationItem or Task
Environment
“MX204 Router Environmental
Specifications” on page 55
Verify that environmental factors such as
temperature and humidity do not exceed
router tolerances.
Power
“MX204 Router Grounding
Specifications” on page 57
Locate sites for connection of system
grounding.
“MX204 Router DC Power
Specifications” on page 42
“MX204 Router AC Power
Specifications” on page 38
Measure distance between external power
sources and router installation site.
“Power Consumption for a
DC-Powered MX204 Router” on
page 72
“Power Consumption for an
AC-Powered MX204 Router” on
page 70
Calculate the power consumption and
requirements.
Rack
“MX204 Router Rack
Requirements” on page 61
“MX204 Router Cabinet
Requirements and Specifications”
on page 58
Select the type of rack or cabinet.
53

Table of Contents

Other manuals for Juniper MX204

Related product manuals