•
See “Powering On an AC-Powered MX204 Router” on page 94.
•
See “Powering On a DC-Powered MX204 Router” on page 98.
11. Perform the initial system configuration.
See “Performing the Initial Software Configuration for the MX204 Router” on page 108.
RELATED DOCUMENTATION
MX204 Router Rack Requirements | 61
MX204 Router Clearance Requirements for Airflow and Hardware Maintenance | 60
MX204 Router Cabinet Requirements and Specifications | 58
Unpacking the MX204
IN THIS SECTION
Tools and Parts Required to Unpack the MX204 Router | 78
Unpacking MX204 Router | 79
Verifying the MX204 Router Parts Received | 80
Tools and Parts Required to Unpack the MX204 Router
To unpack the router and prepare for installation, you need the following tools:
•
Phillips (+) screwdriver, number 2
•
1/2-in. or 13-mm open-end or socket wrench to remove bracket bolts from the shipping pallet
SEE ALSO
MX204 Chassis Description | 23
78