EasyManua.ls Logo

Kinoton FP 30 E Premiere - Threading for Projection Operation; General Threading

Default Icon
103 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...

Issue: 08/2012

 
 
Put the full reel on the upper reel
shaft or prepare the platter system.
Open the sprocket pad shoe.
- Thread the lm in the feed
sprocket (all perforations engaged
in sprocket teeth).
- Close the pad shoe.
Thread the lm in the lm gate.
- Close the lm pressure skate.
- One whole frame must be centred
vertically in front of the aperture
opening. There is a small light
inside the aperture to assist in
centring.
- Assure the lm is centred
horizontally between the ceramic
discs.





Thread the lm through the guide rollers to the sound head (35 mm lm) and then to
the bottom sprocket. The sound pressure roller may be lifted to ease threading
Open the sprocket pad shoe. Thread the lm in the holdback/bottom sprocket (all per-
forations engaged in the sprocket teeth). Close the pad shoe. Verify the loop below
the gate is still OK.
Wind-up the lm several times around the take-up reel or lead the lm to the “take-
up” level of the platter system.

If the projector was switched off with a threaded lm the lm loops and the lm position
must be checked when the projector is switched on again.












Table of Contents

Related product manuals