EasyManua.ls Logo

LELY ASTRONAUT A3 - Examine the Quantity of Astri-CID; Examine the Quantity of Astri-LIN; Examine the Quantity of Astri-L; Examine the Quantity of Astri-UC

LELY ASTRONAUT A3
138 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Preventive Maintenance 7-19
D-H001.0609EN
7.14 Examine the Quantity of Astri®-CID
Note:
The red hose goes to the Astri®-CID container.
1. Open the doors of the machine room.
2. Make sure there is sufficient Astri®-CID in the container and the hose is sufficiently into the liquid to suck
correctly.
3. If necessary, replace the container with a full one when the level is too low.
4. Close the doors of the machine room.
7.15 Examine the Quantity of Astri®-LIN
Note:
The blue hose goes to the Astri®-LIN container.
1. Open the doors of the machine room.
2. Make sure there is sufficient Astri®-LIN in the container and the hose is sufficiently into the liquid to suck
correctly.
3. If necessary, replace the container with a full one when the level is too low.
4. Close the doors of the machine room.
7.16 Examine the Quantity of Astri®-L
Note:
The green hose goes to the Astri®-UC container.
1. Open the doors of the machine room.
2. Make sure there is sufficient Astri®-L in the container and the hose is sufficiently into the liquid to suck
correctly.
3. If necessary, replace the container with a full one when the level is too low.
4. Close the doors of the machine room.
7.17 Examine the Quantity of Astri®-UC
Note:
The transparant hose goes to the Astri®-UC container.
1. Open the doors of the machine room.

Table of Contents

Related product manuals