Maintenance work on the carrier
7.13 Steering
09.03.2018
Maintenance manual 3 302 744 en 7 - 95
GMK5250L
7.13 Steering
7.13.1 Checking for leaks
• Check the hydraulic system of the steering (steering cylinders, pipes and
hose lines and their connections) for leaks.
• Top up oil if necessary; à Checking the oil level, p. 7 - 101.
After changing pipes and hose lines
• Bleed the hydraulic system; à Bleeding the hydraulic system, p. 7 - 114.
If damage cannot be rectified immediately or further damage is likely
• Notify Manitowoc Crane Care or an authorised GROVE dealer or your repair
crew.
D
G
Risk of accidents from hydraulic oil spraying out.
Never tighten leaking connections when the system is under pressure.
Change pipes and hose lines only when the system is depressurised.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals