Maintenance work on the superstructure
8.14 Other maintenance work
8 - 90 3 302 744 en Maintenance manual
GMK5250L
09.03.2018
8.14.6 Renewing the corrosion protection
Protective agent,
tools
– Spray gun with spray extension.
–Brush.
– Protective clothing, protective goggles.
Prerequisites – The superstructure must be thoroughly cleaned.
– The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
Check the
following
Some particular parts of the superstructure were sprayed for corrosion pro-
tection for the first time in the factory itself.
These are pumps, valve blocks, controls and fittings, pipes, screw connec-
tions, hose fittings of the hydraulic system of the superstructure;
à p. 8 - 91.
The corrosion protection is solvent-free and is water soluble while being
sprayed on. A transparent, waxy, protective film is formed after a drying
time of one hour.
• Check the condition of the original protective film.
• If required, remove any rust and touch up the paintwork before you spray
on a new protective film.
Processing
instructions
• Observe the processing instructions for corrosion protection;
à Processing instructions, p. 7 - 147.
M 12
Protective agent GROVE part no.
Corrosion protection 03140192

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals