EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #182 background imageLoading...
Page #182 background image
Maintenance work on the carrier
7.15 Hydraulic system
7 - 106 3 302 744 en Maintenance manual
GMK5250L
09.03.2018
7.15.6 Taking oil samples
Reducing the
interval
• Under difficult operating conditions – at tropical or very hot locations –
you must halve the oil change interval.
Spare parts and
tools
– A hose with a connecting piece for a gauge port.
– A sample container 0.3 l (0.08 gal).
– Receptacle, approx. 5 l (1.5 gal); à p. 2 - 4.
Prerequisites – The engine must be switched off and secured against unauthorised use;
à p. 2 - 3.
Select the
sampling location
To determine the usability of the oil, you must take a sample from the
hydraulic system. To do that you must connect the hose with the connecting
piece to a gauge port.
• Remove the cover (3).
The gauge port (1) is located on the cylin-
der (2) of the outrigger.
• Clean the gauge port before connecting the
hose.
M 12
Hose lengths GROVE part no.
1 m (3.3 ft) 01923003
2 m (6.6 ft) 00551941
4 m (13.2 ft) 01923139
GROVE part no.
A set of sample containers with protective mailing bag
and delivery note to the contracted laboratory
03141012

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals