Run-in regulations
09.03.2018
Maintenance manual 3 302 744 en 4 - 1
GMK5250L
4 Run-in regulations
There are rules about running in individual parts which must be followed
after:
– First commissioning or
– Replacement of a part or
– General inspection.
This is why you must carry out additional maintenance work on the carrier
and superstructure after specific periods of time have expired:
s
Operating
hours
(oper. hrs.)
Driven km
(mi)
Additional maintenance work on the CAR-
RIER
after 4
and 24
Check the V-belt on the second alternator
(additional equipment);
à Check V-belt tension, p. 7 - 22.
after 50 (30) Tighten the wheel nuts;
à Special torques, p. 10 - 2.
after 150
(95)
Tighten the wheel nuts;
à Special torques, p. 10 - 2.
after 50 Tighten the clips on the coolant hoses;
à Special torques, p. 10 - 2.
after 100 Lubricate the outrigger beams;
à Lubricating the outrigger beams, p. 7 - 144.
during
the first 100
Check the hydraulic oil filter every week, and
change it if necessary;
à Cleaning the magnetic rods, p. 7 - 103,
à Changing the hydraulic oil filter, p. 7 - 115.
after 100 after 1,000
(650)
Change the drive oil;
à p. 7 - 50 for the transfer case,
à p. 7 - 63 for the axle centre drives,
à p. 7 - 68 for the final drives.
after 250 after 2,500
(1,550)
Change the engine oil;
à Engine manufacturer's documentation.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals