EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #87 background imageLoading...
Page #87 background image
Maintenance work on the carrier
7.3 Engine
09.03.2018
Maintenance manual 3 302 744 en 7 - 11
GMK5250L
7.3 Engine
• In addition, carry out the additional maintenance work as specified in the
Engine manufacturer's documentation supplied with the vehicle.
• At the first oil change, fit a drain valve in place of the drain plug;
à p. 7 - 14.
7.3.1 Checking the oil level
Prerequisites – The truck crane must be level.
Checking the oil
level
• Start the engine from the driver's cab; à Operating manual.
• Start the engine and watch the symbol (1).
• Stop the engine immediately if the symbol does not disappear after
10 seconds.
If symbol (1) is displayed, the oil pressure is too low.
• Allow the engine to run at idling speed for 2 - 3 minutes.
• Switch off the engine.
• Check the oil level after approx. 2 minutes.
s
D
S
Risk of damage to the engine if the oil pressure is too low.
Switch off the engine immediately if the symbol (1) is displayed. The engine
can be damaged by running it when the oil pressure is too low.

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals