EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #37 background imageLoading...
Page #37 background image
Maintenance overview
5.1 Maintenance intervals
09.03.2018
Maintenance manual 3 302 744 en 5 - 1
GMK5250L
5 Maintenance overview
– Maintenance plans D (= daily),
– Maintenance plans W (= weekly) and
– Maintenance plans M 1 (= once a month) to M 12 (= every 12 months) and
– Maintenance plans Y 2 (= every 24 months) to Y 10 (= every 120 months).
The maintenance plans are given in table form, divided into
– Maintenance work on the carrier and
– Maintenance work on the superstructure.
In the tables, cross references direct you to the sections in which the appro-
priate maintenance work is described. The cross references consist of the
chapter number and the corresponding page number, e.g.
Check hydraulic oil level;
à p. 7 - 101.
Checking the hydraulic oil level is described in chapter 7, the section starts
on page 7 - 101.
5.1 Maintenance intervals
The length of the maintenance interval depends on the grade of oil used and
operating conditions of the truck crane.
The next maintenance must be carried out after
– a specified time (maintenance interval) or
– a specified number of driven km (mi) or
– a specified number of operating hours (oper. hrs.) or
–an indication on the CCS display in the driver's cab; à p. 7 - 9 or
–an indication on the CCS display in the crane cab; à p. 8 - 7.
s

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals