EasyManuals Logo
Home>Manitowoc>Construction Equipment>Grove GMK 5250L

Manitowoc Grove GMK 5250L Maintenance Manual

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #38 background imageLoading...
Page #38 background image
Maintenance overview
5.1 Maintenance intervals
5 - 2 3 302 744 en Maintenance manual
GMK5250L
09.03.2018
The maintenance interval which occurs first determines when the next
maintenance is due.
–The driven km (or mi) can be taken from the speedometer.
– You can individually call up the Operating hours (oper. hrs.) of the engine
and power units on the
CCS display.
The following table sets out the maintenance intervals for the maintenance
plans:
Please note that the long-term maintenance plans always include the
short-term ones.
Mainten-
ance plans
Maintenance
interval
Driven km (mi)
(carrier)
Engine operating
hours (oper. hrs.)
D
daily/before start-
ing up
— —
W weekly — —
M 1 monthly
approx. 2,000
(approx. 1,240)
approx. 100
M 3
every three
months
5,000 – 6,000
(3,100 – 3,730)
250
M 6 every six months
10,000 – 12,500
(6,210 – 7,770)
500
M 12 every 12 months
20,000 – 25,000
(12,430 – 15,530)
1,000
Y 2 every 24 months
40,000 – 50,000
(25,000 – 31,000)
2,000
Y 3 every 36 months — 3,000
Y 5 every 60 months
100,000
(62,000)
5,000
Y 6 every 72 months — 6,000
Y 10 every 120 months
200,000
(124,000)
12,000

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals