Maintenance work on the superstructure
8.1 General instructions
09.03.2018
Maintenance manual 3 302 744 en 8 - 5
GMK5250L
Main boom à p. 8 - 47
1 Telescopic sections 1 to 6 and basic section à p. 8 - 48
16 Derricking cylinder à p. 8 - 47
15 Sheaves à p. 8 - 55
Cable drums à p. 8 - 71
11 Cable drum 1 à p. 8 - 71
4 Cable drum 2 à p. 8 - 71
Central lubrication system à p. 8 - 73
10 Centralised lubrication pump à p. 8 - 73
Electrical system à p. 8 - 79
2 Spotlights on the crane cab à p. 8 - 79
14 Spotlights on the telescopic boom à p. 8 - 79
12 Anemometer, air traffic control light à p. 8 - 79
Air conditioning system à p. 8 - 81
3 Crane cab air-conditioning system à p. 8 - 81
8 Condenser fins à p. 8 - 81
5 Pollen filter à p. 8 - 84
Other maintenance work à p. 8 - 85
9 Windscreen washing system receptacle à p. 8 - 85
– Crane cab auxiliary heater
1)
à p. 8 - 86
6 Cab door rails à p. 8 - 87
7 Pull-out step à p. 8 - 88
– Various connecting pins and socket pins à p. 8 - 89
– Corrosion protection à p. 8 - 90
13 Fire extinguisher
1)
à p. 8 - 92
1)
Additional equipment

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Manitowoc Grove GMK 5250L and is the answer not in the manual?

Manitowoc Grove GMK 5250L Specifications

General IconGeneral
BrandManitowoc
ModelGrove GMK 5250L
CategoryConstruction Equipment
LanguageEnglish

Related product manuals