Maintenance overview
5.2 Maintenance plans
09.03.2018
Maintenance manual 3 302 744 en 5 - 5
GMK5250L
Maintenance work on the SUPERSTRUCTURE:
daily/before putting into operation
Hydraulic system
– Checking the oil level à p. 8 - 31
Hoist ropes
– Checking the winding à p. 8 - 57
Electrical system
– Checking the lighting and indicators à p. 8 - 79