EasyManua.ls Logo

Manitowoc Grove GMK 5250L - Page 47

Manitowoc Grove GMK 5250L
354 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Maintenance overview
5.2 Maintenance plans
09.03.2018
Maintenance manual 3 302 744 en 5 - 11
GMK5250L
M 3
Maintenance work on the SUPERSTRUCTURE:
every three months/after 250 oper. hrs.
Slewing bearing
– Checking the screws à p. 8 - 21
Hydraulic system
– Cleaning the magnetic rods à p. 8 - 34
Main boom
– Lubricating the telescopic sections à p. 8 - 48
– Checking the sheaves à p. 8 - 55
Hoist ropes
– Lubricating the hoist rope à p. 8 - 59
Hook blocks
– Checking the sheaves à p. 8 - 75

Table of Contents

Other manuals for Manitowoc Grove GMK 5250L

Related product manuals