85
© 2013 McNeilus Truck and Manufacturing, Inc.
Contender Front Loader
Preventive Maintenance
Daily
Weekly
(50 Hours)
Scheduled PM
(150 Hours)
Semi-Annual
(1250 Hours)
Annuall
y
)
l
Operator
Service
LEGEND
R Replace P Perform
I Inspect L Lubricate
T Torque C Clean
Proper Operation of Tailgate/Body
Cylinder Props
I
Top Door I
Pack/Eject Assembly I
Pack/Eject Track Clearance I
Arm Assembly I
Arm Torque Tube Bolts I/T
Fork Assembly I
Pusher Axle Lug Nuts T
Tag Axle Lug Nuts T
Body Tie-Down Components (used during
propping of the body)
• Missing nuts or pins
• Broken or damaged springs or brackets
I