EasyManua.ls Logo

Medonic CA620 - Page 42

Medonic CA620
108 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation
42 03-11-24 1003en01
6. Remove the grounding wire at the rear of the cover plate.
7. Remove all transport guides at the pinch valves. These guides are red co-
loured plastic clamps inserted in each valve. Save them for later use in case
of a re-installation.
8. Re-assemble the front cover in reverse order. Be sure to reconnect the
ground-wire!
Reagent pack installation
1. Place the reagent pack in the proper place. See Reagent packages on page
40.
2. Put the probes as shown below (the example shows the lyzer container).
1025.tif
1026.tif
Transport guides
Important
One valve is located be-
hind the pre-dilute start le-
ver MPA. Do not forget to
remove the transport
guides in this valve.
The instrument will not
operate correctly in case a
transport guide is not re-
moved. Possible conse-
quences of not removing
all transport guides are:
Indication numbers, incor-
rect parameter results and/
or incorrect counting
times.
1027.bmp

Table of Contents

Related product manuals