72
4.3
paraMETEr sETTinG
paGE
The Parameter Setting webpage can be
downloaded by clicking on the Parameter
Setting link in other webpages of the meter.
The webpage as shown in Fig 84 should
appear.
noTE:
The CT secondary current is fixed at 5A.
In this webpage, the user is allowed
to modify the following displayed
parameters:
• VT primary voltage
• VT secondary voltage
• CT primary current
• power demand interval
• power demand sub interval blocks
• thermal current demand interval
• thermal current demand sub
interval blocks
By clicking on the links at the bottom, the brower
will download the corresponding webpage.
Clicking on the Parameter Setting link will reload
this webpage.
Webpage Operations 4.3