Maintaining Your Analyzer
10-12
Figure 10-13 shows.
Figure 10-13 E-Z cleaning
4. When the soaking is done, the analyzer will start the draining process, as Figure 10-14
shows. When the draining is done, the whole procedure is over and the screen will return
to the initial state.
Figure 10-14 Draining the bath and fluidic lines
If the accumulated analyzed samples reach 100, a message box, as Figure 10-15 shows, will
pop up to remind you to perform the “E-Z cleanser cleaning procedure. If you want to do so,
CLICKYes “. Otherwise, CLICKNo” to cancel the cleaning.