Chapter 1 Machine Setup
1-19
setup/parameter/More System
setup/Machine/Option/General
System setup/Machine/Option/More
Record the software version.
Peripheral (TF and others)
check Homing check Pallet key
operation check I/O control check
Solenoid operation check LED
display check Y-Axis Operating
Magazine Operating
Customer Set up Check
Sheet CIS-6 : W/U, Dry run &
Placement
No
Check Item
Check Criteria
Result
Work Hour
Remark
01
W/U, Dry run
Run for 30 min or
longer
1. Machine vibration, noise
Detection/Visual
inspection
2. Operation (Gantry, Head)
3. Machine foot vibration
02
DEMO B/D Placement test
1. Conveyor width adjustment
Operation/Visual
inspection
2. PCB Loading
3. PCB home check
4. Nozzle installation(Ball check)
5. Feeder placement and
communication check
6. Parts recognition check
7. Dry run
8. Placement & precision check