EasyManua.ls Logo

Mirae Mx200 - DAILY CHECK (EVERY 24 HOURS); Air pressure check (before running)

Default Icon
681 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Chapter 4 Regular Check4 -
4-3
Daily Check (Every 24 Hours)
Air pressure check (before running)
Module: Cover
Check
Procedure
1. Main Air Location: Bottom right at rear of machine
Acceptable main air pressure range is 0.45 to 0.54 Mpa (Setting
value:0.5Mpa) If the air pressure of the Main Air Gauge
exceeds the rated pressure range, adjust air pressure by turning
the Main Air Control Valve at the bottom.
The limit value of the digital pressure gauge for suction is set in the following way.
2. Suction/Blow pressure of head Location: Bottom
right at rear of machine Acceptable pressure for
suction/blow range is 0.35 to 0.45 Mpa.
(Setting value: 0.4 Mpa)
If the air pressure of Main Air Gauge exceeds the rated pressure range,
adjust air pressure by turning the Main Air Control Valve at the bottom.
Nozzle Air Pressure
Gauge
Main Air
Control Valve
Nozzle Air Pressure
Control Valve
Main Air Gaug
e

Table of Contents

Related product manuals