EasyManua.ls Logo

Mitutoyo CONTRACER CV-2100 - Page 59

Mitutoyo CONTRACER CV-2100
98 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3. Preparation for measurement
No. 99MBB793A
3-17
Click the [Leveling] button.
TIP
No change in settings is necessary, but change the settings as necessary. Refer to
"FORMTRACEPAK (Measurement)" for further information.
The message below is displayed.
Click the [OK] button.
Measurement for leveling will start. After the measurement, the results will be displayed.
Rotate the measuring main unit with tilting handle to level the calibration gage.
To perform re-measurement, click the [Repeat] button.
To finish leveling, click the [Exit] button.
[Leveling] button
[OK] button
[Repeat] button
[Exit] button

Table of Contents

Related product manuals