EasyManuals Logo

MTS Systems FlexTest SE Service Information

Default Icon
248 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #110 background imageLoading...
Page #110 background image
Model 493.02 Controller Service
Calibrating an LVDT
Calibration
110
Task 4 Set the phase
This task determines the proper phase adjustment. The phase
adjustment matches the phase of the AC feedback signal to the 10 kHz
demodulation excitation signal.
1. Fully retract the actuator.
Stand-Alone— Using the front panel Dial, adjust the Setpoint to
fully retract the actuator. Path: Status > Setpoint
Automated— Adjust the Manual Cmd slider control on the
Manual Command window to fully retract the actuator.
2. Remove hydraulic pressure.
3. Adjust phase for the maximum conditioner output.
Monitor the appropriate AC conditioner feedback signal. Adjust
Phase to achieve a maximum value.
Stand-Alone—Path: Setup > Disp > Calibration > Phase
AutomatedAdjust the Phase control on the Calibration tab to
achieve a maximum value. For automated systems, use the
Station Signals panel to monitor the appropriate AC conditioner
feedback signal
Note When adjusting phase, the LVDT feedback may exceed 10 volts. You
may need to lower conditioner gain before continuing phase
adjustment.

Table of Contents

Other manuals for MTS Systems FlexTest SE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems FlexTest SE and is the answer not in the manual?

MTS Systems FlexTest SE Specifications

General IconGeneral
BrandMTS Systems
ModelFlexTest SE
CategoryController
LanguageEnglish

Related product manuals