Model 493.02 Controller Service
CE EMC Compliant Cabling
Cabling
44
Power up sequence Turn on the master controller first and allow its software to fully boot
before turning on the slave controllers. The slaves must be turned on
in their chain-designated order; Slave 1 before Slave 2. Failure to
observe this power up order will result in interlocks and will require
you to restart all controllers.
Remove power from the controller chain in reverse order; powering
down the end-of-run slave controller first.
Interlock function Power must be applied to all Controllers in the chain for proper
interlock operation. If power is not applied to any one of the
Controllers, you will not be able to clear an interlock condition in any
of the Controllers.
Also, if one of the Box In cables becomes disconnected from a slave
controller or a cable is connected to Box In on the master controller,
an interlock is set which cannot be reset until all controllers are
restarted.

Table of Contents

Other manuals for MTS Systems FlexTest SE

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the MTS Systems FlexTest SE and is the answer not in the manual?

MTS Systems FlexTest SE Specifications

General IconGeneral
BrandMTS Systems
ModelFlexTest SE
CategoryController
LanguageEnglish

Related product manuals