Fiber optic cable management in the 
7360 ISAM FX-16 shelf
146
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
Figure 68 Fiber routing without a fiber management guide for 
7360 ISAM FX-16
Procedure 26 To mount the fiber management guide
Use the following procedure to mount the fiber management guide onto the 7360 ISAM FX-16.
1 Ensure the fiber management bracket is already mounted onto the fiber management cable 
bracket on the shelf as described in Chapter 5 “Installing a 7360 ISAM FX-16 shelf”, section 
5.4 “Installing a 7360 ISAM FX-16 heat and fiber baffle kit”.
2 Align the pre-assembled fiber management bracket and fiber guiding elements with the finger 
guides located on the top of the shelf; see Figure 69.
PWR 
A
/S 
AL
M
 
2
 
4
 
6
 
8
 
1
 
3
 
5 
7 
PW
R 
A/
S 
ALM 
2
 
4
 
6
 
8
 
1 
3 
5 
7 
PW
R 
A
/S 
ALM
 
2
 
4
 
6
 
8 
1
 
3
 
5
 
7
 
PW
R
 
A/S 
ALM 
2 
4 
6 
8 
1
 
3
 
5
 
7
 
PW
R 
A/
S 
AL
M 
2 
4 
6 
8 
1 
3 
5
 
7
 
PW
R
 
A/
S 
AL
M
 
2
 
4
 
6
 
8
 
1 
3 
5 
7 
PW
R 
A/S 
AL
M
 
2
 
4
 
6
 
8
 
1
 
3
 
5
 
7
 
PW
R 
A/S 
AL
M
 
2
 
4
 
6
 
8
 
1
 
3
 
5
 
7
 
25373
Note —  The 7360 ISAM FX-16 fiber management bracket pre-
assembly that is included in the heat and fiber baffle kit must be installed 
after the heat and fiber baffle kit.