Installing racks
62
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
4.2.3 Parts list
You need the shipping container with rack and accompanying parts for this 
procedure.
4.2.4 Recommended tools
The following tools are recommended:
• adjustable wrench, 12 in. (30.5 cm)
• carpenter's claw hammer
• pinch bar, nail puller, or ripping chisel
• safety glasses
• shears common, metal
• tin snips
Procedure 6 To unpack equipment
1 Inspect each shipping container for damage. 
2 If there is damage, notify the transportation carrier and Nokia immediately. Photograph all 
damaged containers. Keep all inspection and packing documents for reference.
3 If there is no damage, place the container on a level floor as near to the final installation 
location as possible. This area must be free of moisture, dirt, and dust.
4 Carefully open the top of the container. Take care not to damage the equipment.
5 Remove the exterior packing or bracing material.
Danger —  The material-handling equipment necessary for safe 
handling includes a forklift truck, lifting sling or block and tackle, 
and dolly. To prevent injury to personnel when operating the 
material-handling equipment, use extreme care and follow 
standard safety precautions.
Warning —  Exercise care when moving the equipment. 
Excessive shock or vibration can cause damage to the 
equipment.