Installing racks
74
ANSI Hardware Installation Manual
3HH-12893-AAAA-TCZZA Issue: 09
DRAFT
Figure 20 Bracing the rack to overhead (example)
8 Verify rack leveling and adjust as required.
9 Tighten the top support hardware.
10 STOP. This procedure is complete.
22367
Overhead rails/cable raceway
J-Bolts
Clip
Clip
Lockwasher
Nut
5/8-11 tapped hole
5/8-11 threaded rod
(secure with lock nut)