EasyManua.ls Logo

Nordmann Engineering AT4 D - Default Chapter; Table of Contents

Nordmann Engineering AT4 D
76 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
3
1 Introduction 4
1.1 To the very beginning 4
1.2 Notes on the operating instructions 4
2 For your safety 6
3 Product Overview 8
3.1 Models overview 8
3.2 Identicationoftheunit 9
3.3 Steam generator construction 10
3.4 Functional description 11
3.5 Humidicationsystemoverview 13
4 Operation 14
4.1 Commissioning 14
4.2 Notes on operation 15
4.2.1 Functionofthedisplayandoperatingelements 15
4.2.2 Remoteoperatingandfaultindication 16
4.2.3 Notes on the operation at ambient
temperatures≤0°C 16
4.2.4 Inspectionsduringoperation 16
4.3 Carrying out manual draining 17
4.4 Takingtheunitoutofoperation 17
5 Working with the unit control 18
5.1 Operating the control unit and menu overview 18
5.2 Basic steam bath settings 20
5.2.1 Setting the temperature setpoint (steam bath
operation) or humidity setpoint (caldarium operation) 20
5.2.2 Setting the control mode 20
5.2.3 Setting the steam bath time 21
5.2.4 Conguringthefragrancepump(s) 21
5.2.5 Switchingtheeffectlight(Light-2)onandoff 22
5.3 Unit settings in the user settings menu 23
5.3.1 Launchingtheusersettingsmenu 23
5.3.2 Selecting the dialogue language 23
5.3.3 Steam bath control settings 23
5.3.3.1 Setting the operation mode 24
5.3.3.2 Conguringweektimer 24
5.3.3.3 Settingthemaximumheatingtimefor
week timer operation 25
5.3.3.4 Fancontrolsettings 26
5.3.3.5 Fragrance pump control settings 30
5.3.3.6 Lightcontrolsettings 30
5.3.3.7 Sensor signal settings 31
5.3.3.8 Setting the controller type 35
5.3.3.9 Settingtheproportionalrangeforthe
internal P/PI controller 35
5.3.3.10 SettingtheintegraltimefortheinternalPIcontroller 35
5.3.3.11 ConguringtheQuasiOn/Offcontrol 36
5.3.3.12 Settingthemaximumdooropeningtime 36
5.3.4 Selecting the cylinder type 37
5.3.5 ConguringtheSCsystem 37
5.3.5.1 Activating/deactivating the SC system 37
5.3.5.2 SettingtheoperationtimeoftheSC-Pump 38
5.3.6 Conguringthecapacitylimitation 38
5.3.7 Watermanagementsettings 39
5.3.7.1 Selectingtheconductivityrangeofthesupplywater 39
5.3.7.2 Settingthedrainfactor 39
5.3.7.3 Settingtheoperatingmodeforstandbyoperation 40
5.3.7.4 Activating/Deactivatingtheforceddraining 42
5.3.7.5 Settingthetimeofoperationafterwhicha
forceddrainingtakesplace 43
5.3.8 Setting the date 43
5.3.9 Settingthetime 43
5.3.10 Setting the display contrast 43
Contents
5.4 Modbus settings 44
5.4.1 SettingsforModbusnetworks 44
5.4.2 Settingsforthecommunicationwiththe
optional remote terminal 45
5.5 Diagnosticfunctions 46
5.5.1 Interrogationoftheerrorhistory 46
5.5.2 Interrogationofunitinformation 47
5.5.3 Performingremotesteambathtests 48
5.5.4 Performingremoterelaytests 49
5.5.5 PerformingModuletests 49
5.6 Workingwiththeremoteterminal 50
5.6.1 Menuoverviewremoteterminal 50
5.6.2 Remoteterminalsettings 51
5.6.2.1 Selectingthedialoguelanguage 51
5.6.2.2 Settingthenumberofsteamgenerators
connected to the remote terminal 51
5.6.2.3 Interrogationoftheerrorhistoryofthe
remote terminal 51
5.6.2.4 Resettingtheerrorhistorylistoftheremoteterminal 52
5.6.2.5 Settingthebaudrate 52
5.6.2.6 Settingthedisplaycontrast 52
6 Maintenance 53
6.1 Importantnotesonmaintenance 53
6.2 Maintenancelist 54
6.3 Removingandinstallingpartsformaintenance 55
6.3.1 Removalandinstallationofthesteamcylinder 55
6.3.2 Removalandinstallationofthedraincup 58
6.3.3 Removalandinstallationofthewatercupand
thewaterhoses 59
6.3.4 Removalandinstallationofthedrainpump 60
6.3.5 Removalandinstallationoftheinletvalve 61
6.3.6 Removalandinstallationofthecylinderreceptacle 62
6.4 Notesoncleaningtheunitcomponents 63
6.5 Notesoncleaningagents 65
6.6 Resettingthemaintenanceindication 65
7 Fault elimination 66
7.1 Faultindication 66
7.2 Malfunctionlists 67
7.2.1 Systemfaults 67
7.2.2 Unitfaults 68
7.3 Notesonfaultelimination 70
7.4 Resettingtheerrorindication(redLEDlights) 70
7.5 Replacing the backup battery on the control board 71
8 Taking out of service/Disposal 72
8.1 Takingoutofservice 72
8.2 Disposal/Recycling 72
9 Productspecications 73
9.1 Technicaldata 73
9.2 WiringdiagramNordmannAT4D 74

Table of Contents

Other manuals for Nordmann Engineering AT4 D

Related product manuals