4 Operation 30
4.1 Safety 31
4.1.1 Safe work routine 31
4.1.2 Operator safety 31
4.1.3 Other people's safety 31
4.1.4 Assembly on site 31
4.1.5 Elements of hazard during operation 31
4.1.6 Danger zones during operation 32
4.1.7 Risk of overturning 32
4.1.8 Leaving the machine 32
4.2 Connection and setting up the machine 32
4.2.1 Rig up 32
4.2.2 Lever/Controls overview 33
4.2.3 Lever list 33
4.2.4 Leveling the machine 34
4.2.5 Placing the tractor with telescopic drawbar 34
4.2.6 Power take off 34
4.2.7 PTO Speed 34
4.2.8 Electrical power source 34
4.2.9 Hydraulic connections 34
4.2.10 Oil temperature 35
4.2.11 Stairs 35
4.3 Daily checklist 35
4.3.1 Daily checklist prior to startup 35
4.3.2 Checkpoints while baling 36
4.4 Break-in period 36
4.4.1 Precautions during the break-in period 36
4.4.2 After the first 50 hours of operation 36
4.5 Automatic operation 37
4.6 Film roller storage 38
4.7 Wrapping arms 38