EasyManua.ls Logo

PFT G 4 X - Putting the Machine into Operation; Check Consistency of Mortar; Start the Machine in a Flying Mode

PFT G 4 X
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mixing pump G 4 X smart Overview - Operation and service
Putting the machine into operation
38 2021-08-12
34 Putting the machine into operation
34.1 Check consistency of mortar
Fig. 50: Consistency test tube
1. Connect consistency test tube at the mortar pressure gauge.
2. Place a bucket or pan under the consistency test tube.
Article number: 20104301 Consistency test tube 25m piece
34.2 Start the machine in a “flying” mode
Fig. 51: Switching on
1. Turn the selector switch (1) for the star wheel to the right.
2. Switch on the machine, press the green push button (2) control
voltage “ON”.
Fig. 52: Consistency of mortar
3. Check consistency of mortar
Fig. 53: Switching off
4. Switch off the machine, press the red push button (4) control
voltage “OFF”.
5. Remove consistency test tube and clean it.
2
1
4

Table of Contents

Related product manuals