EasyManua.ls Logo

PFT G 4 X - Maintenance Plan; Maintenance Work

PFT G 4 X
72 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Mixing pump G 4 X smart Overview - Operation and service
Maintenance
2021-08-12 63
47.4 Maintenance plan
The following paragraphs describe the maintenance works that are
require for an ideal and trouble-free operation.
In the event that increased wear is detected during regular checks,
the required maintenance intervals have to be shortened according
to the actual signs of wear.
Should you have any queries regarding maintenance works and
intervals contact the manufacturer, see page 2 for service
addresses.
NOTE!
Maintenance is limited to a few checks. Thorough
cleaning after use is the most important
maintenance.
Interval Maintenance work To be carried out by
monthly Clean/replace filter of compressor. Service engineer
monthly
Clean/replace plastic sieve in strainer.
Operator
monthly Clean/replace strainer screen in pressure reducer. Service engineer
47.5 Maintenance work
47.5.1 Air filter compressor
1 2
Fig. 99: Air compressor
Execution by service technician.
Remove air compressor from bracket:
1. Loosen air hose (1) from the air compressor.
2. Fold compressor bracket (2) upwards and remove air
compressor from bracket.
NOTE!
Take the weight of the air compressor into
consideration.
Fig. 100: Filter of the air compressor
3. Remove filter cover.
4. Take out the filter.
5. Blow through the filter from the inside to the outside or tap it.
6. Replace the filter in case of heavy contamination.
7. Insert the filter with the solid side of the filter (1) pointing
inwards.
3

Table of Contents

Related product manuals