Installation and Operation Manual Page 49 of 104
(PVI-3.8/4.6-I-OUTD-US Rev.: 1.1)
Perform the selection of the grid standard basing on the following table
Left selector Right selector Grid standard Display language
0 0 Default English
0 1 VDE (Germany) German
0 2 UL - 208 Single Phase English
0 3 UL - 240 Split Phase English
0 4 UL - 277 Single Phase English
0 5 Enel (Italy) Italian
Once installer has selected the standard the 24h counter will start decrease. During the
first 24h of grid connection it is still possible to change standard (in case of mistakes).
User can check the counter residual time scrolling the menu
Fig. 19 - Grid Standard selectors
3.3.10 Grounding mode and Ground fuse replacement
WARNING: Before performing any operation on the Switch Box power
input or on the Inverter, ALWAYS perform the disconnection procedure as
explained in section 3.3.1 or 3.3.2 of this manual.