14.1 - How to turn on/off the pair of lanes
QubicaAMF suggest to turn off the scoring system every night to save power.
14.1.1 - Turning ON the system.
This is the procedure to follow in order to turn on the system in the mornings for BES X Scoring systems:
Turn on Front-desk 1 / Terminal 1;
If a separate server is present it should already be ON;
Turn on overhead monitors;
Wait until the Front-desk1 / Terminal1 boot up completely (note that in the case of ConquerorPRO
backup you should wait until the end of it) then turn on the 4HD/5HD-HUB units;
Turn on all other ConquerorPRO Front desks / Terminals.
In case of LCD monitors controlled from the Front Desk (AccuVision, etc…) turn on the monitors
from the Special Functions of the Front Desk.
14.1.2 - Turning OFF the system.
This is the procedure to follow in order to turn off the system in the nights for BES X Scoring systems:
In case of LCD monitors controlled from the Front Desk (AccuVision, etc…) turn off the monitors
from the Special Functions of the Front Desk.
Close ConquerorPRO in all the stations;
Turn off Front-desk1 / Terminal1;
Accept “Execute daily task”;
NOTE: if a separate server is present, or in the case you purchase a web-booking system the
ConquerorPRO server computer should be kept on at all times;
Turn off all the other Front desks / Terminals;
Turn off the 4HD/5HD-HUB units from the Electronic sub-panel breakers;
Turn off Overhead Monitors from the Electronic sub-panel breakers.
14.2 - How to boot the BES X system in emergency (in the
case of a ConquerorPRO server PC crash)
If the ConquerorPRO server is down and there are either no other ConquerorPRO licensed computers
available (it is not possible to convert a Front Desk 2, 3, etc…, or convert the Back Office into a
ConquerorPRO server) it is possible to reboot lanes in emergency.
To boot the BES X system in emergency:
Keep the ConquerorPRO server turned off, or disconnect the network cable from the Scoring NET
network card (the secondary network card).
Reset (turn off and on) all the 4HD/5HD-HUB units by unplugging the power units;
The 4HD/5HD-CPU units boot without IP address, displaying a RED background on the lane
monitors.
In emergency the lanes can be opened using either the lane consoles keypads (EasyKey) or LCD touch
screens (SuperTouch).