EasyManua.ls Logo

QubicaAMF BES X - Installation Instructions for Single Pedestals

Default Icon
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
T. 0.01 61
JUN 20th 1820
286002861 SINGLE AND
286002863 SHORT SINGLE
PEDESTAL ASSEMBLY
INSTRUCTIONS
[ ]120
4.72
[ ]120
4.72
[ ]54.8
2.16
[82]
3.23
[60]
2.36
[12]
.47
[ ]60.3
2.37
[ ]60.3
2.37
[ ]299.4
11.79
[ 6 ]19 .7
7.74
[98.4]
3.87
REAR OF PEDESTAL
FRONT OF PEDESTAL
CABLE
PASSAGE
PLAN VIEW
4X standard mounting
positions marked A’
2X alternate mounting
positions marked ‘B’
6
21
20
18 19
1
10
17
7
11
2
15
5
13
12
3
8
14
9
22
23
24
A
A
A
A
B
B
INSTALLATION INSTRUCTIONS:
1. Un-pack pedestal,
. Remove mounting hardware stretch wrapped to extrusion (item 3).2
. Remove V-Support back (item 5) secured by 2 M5-,8 X 25 (item 15).3 PHPMS SCREWS
. Remove front & rear base covers (items 6 & 7) secured by 4 M4-,7 X 16 screws (item 17).4 FHPMS ZN
. Position pedestal on the floor in the desired position and orientation. Please install the pedestal in a position far enough5 NOTE:
away from the ball rack to avoid potential damage caused by bowling balls falling from the ball rack.
6. Mark/transfer the mounting holes in base sheet metal - lower (item 1) to the floor. Note if the standard mounting hole positions
marked A in the plan view below interfere with the cable conduit in the floor, use both of the aternate positions marked ‘B’ in
the plan view below for the supplied anchors.
. Remove base sheet metal - lower (item 1) from base sheet metal - upper (item 2) secured with 8 each of M5-,8 X 16 (item7 HHCS
12) & M8 D-127A (item 13).SWM ZN
. Position base sheet metal - lower (item 1) on the floor and install with the appropriate supplied anchors.8
For wood floors drill Ø 1/4 holes and secure using 4 or 5 each of 0.41 X 0.73 X 0.06 (item 19), 3/8 (itemFW ZN SWM ANSI ZN
18), and HHLB 3/8 X 2.00 ZN (item 20).
For concrete floors drill Ø 3/8 holes to a minimum depth of 3-1/2 inches [89mm], clear the holes of all debris and secure using 4
or 5 each of FW 0.41 X 0.73 X 0.06 ZN (item 19), SWM 3/8 ANSI ZN (item 18) and ANCR TB 3/8 X 3.00 ZN (item 21). Drive taper
bolt into place leaving 3/16 inch [4.8mm] head clearance. Tighten taper bolt to minimum of 40FT-LB [54 N.m].
extra flat washers FW 0.41 X 0.73 X 0.06 ZN are included for leveling purposes; if not needed discard.NOTE:
. Install console cables thru the anti-short bushing (item 10) and thru the extrusion (item 3).9
. Re-install pedestal on base sheet metal - lower and secure with 8 each of HHCS M5-,8 X 16 (item 12) & SWM M8 D-127A ZN10
(item 13).
11. Re-install front & rear base covers (items 6 & 7); secure using 4 FHPMS M4-.7 X 16 screws (item 17).
. Install keyboard or LCD assembly and connect per instructions provided with keyboard or LCD.12
. Re-install V-Support back (item 5); secure using 2 PHPMS M5-.8 X 25 screws (item 15).13
Take care not to pinch any wires or cables.

Table of Contents

Related product manuals