16.1 - How to replace the 4HD/5HD-HUB unit
This is the procedure to follow in order to replace a faulty 4HD/5HD-HUB:
Turn off the faulty 4HD/5HD-HUB by unplugging the power cord from the 4HD/5HD-HUB unit itself;
Disconnect and remove the faulty 4HD/5HD-HUB unit from the wall support;
Position and connect the new 4HD/5HD-HUB in the same way as the old one.
Check that all the cables are connected;
Turn on the new 4HD/5HD-HUB.
16.2 - How to replace the 4HD/5HD-CPU unit
This is the procedure to follow in order to replace a faulty 4HD/5HD-CPU
Turn off the pair of lanes where the faulty 4HD/5HD-CPU is installed by unplugging the power cord
from the 4HD/5HD-HUB unit.
Disconnect and remove the faulty 4HD/5HD-CPU;
Connect the new 4HD/5HD-CPU in the same way as the old one. Check that all the cables are
connected;
Turn on the pair of lanes by plugging the power cord to the 4HD/5HD-HUB unit;
Wait until the boot up image is displayed on the lane monitor;
Read the serial number written on the lane monitor;
Enter ConquerorPRO with a user allowed to operate the LANE CONTROL BOX REPLACEMENT;
Select Setup / Technical Setup / Lane Control Box Replacement.
Enter the serial number, retrieved from the lanes monitor, inside the LANE CONTROL BOX
REPLACEMENT window and if necessary press the Lanes Selected field;
Select the destination lanes of the 4HD/5HD-CPU and press OK;