EasyManua.ls Logo

QubicaAMF BES X - Page 86

Default Icon
164 pages
Print Icon
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
LCOM line BES X Installation Manual, Rev.9, Jun 2018
84
84 P/N: 400288005
LCOM is the network that connects the 4HD/5HD-HUB units to: QubicaAMF pinspotter interfaces, camera
assembly, Bumper Control units or other LCOM controlled devices (such as XLMP or EDC).
The LCOM network runs through a four-wire cable, with two wires carrying the power and two wires
carrying the communications bi-directional signal.
QubicaAMF supplies 60ft 20m of LCOM cable for each pair of lanes, enough for a standard installation.
Every LCOM device is exclusively powered through the LCOM line.
The source for the LCOM line on each pair of lanes is the C1 connector on the 4HD/5HD-HUB unit.
The pin out for this connector is:
+: +18 Volts unregulated;
B: Communication ;
A: Communication +;
-: Common.
The recommended size for LCOM wires is AWG 18 - 0.75mm².
The LCOM power line is protected from a short-circuit by an AUTO-FUSE mounted inside the 4HD/5HD-HUB
unit.
The LCOM communication is protected from electrostatic discharge by special devices mounted on all
LCOM electronic boards.
A bad wiring during installation may break some protection devices.

Table of Contents

Related product manuals