The metering system is driven via three hydraulic motors on the left [1] and three hydraulic motors on
the right.
Fig. 82: Hydraulic motors on the left of the metering system
u
Check the components for external damage and leakage.
10.11 Chassis and brakes
The machine is equipped with a two-circuit pneumatic braking system. Chassis and brakes are
decisive for the operational safety of the machine.
WARNING!
Risk of accident due to improperly carried out work
W
ork improperly carried out at the chassis and the braking system compromises the operational
safety of the machine and may lead to severe accidents with personal injury and property damage.
u
Settings and repairs at the braking system may only be carried out by specialist workshops
or approved brake repair services.
10.11.1 Checking the condition and function of the braking system
n
Braking system
The operator is responsible for proper condition of the system.
Proper function of the braking system is essential for the safety of your machine.
Have the braking system regularly
, at least once a year, checked by a specialist workshop.
10. Maintenance and service
120
5903494 AERO GT 60.1