u
Additionally
secure the lifting chuck against
slipping.
u
For a wheel change on the right side in
direction of travel, position the lifting jack
on the right [1] under the axle attachment
or directly on the axle - on the outside right.
u
For a wheel change on the left side in
direction of travel, position the lifting jack
on the left [2] under the axle at the height
of the spring link.
Fig. 88: Lifting jack application points
Wheel assembly
u
Prior to assembly
, clean the contact surface of the wheel at the hub.
u
Prior to assembly, check the wheel nuts and bolts. Replace damaged, stuck or corroded wheel
nuts or bolts.
u
Tighten all wheel nuts in steps and diagonally with a torque wench.
w
Tighten the wheel nuts with a tightening torque of 560 Nm.
w
Screw on all 10 wheel nuts per wheel and tighten them.
Due to setting, the wheel nuts become lose during the first kilometers of travel of the new machine or
after a wheel change.
u
Retighten all wheel nuts after 50 km with the specified tightening torque.
Observe the instructions and required tasks specified by the axle manufacturer for wheel
assembly
.
10.13 Recovery of the machine
If the machine cannot be towed by the tractor, proceed as follows to recover the machine from the
field.
10. Maintenance and service
AERO GT 60.1 5903494
127