In particular, the following points are to be considered:
Is the tractor/machine combination fail-safe?
Are there any people left in the spreading range? Instruct these people to leave the hazard zone.
Will the environmental conditions allow for a risk-free spreading operation? In particular, high wind
speeds are to be considered.
Do you know the area and are you aware of any possible hazard spots?
Do you use the correct fertilizer?
Have you set the correct application rate at the operating unit in the Fertiliser settings menu?
Did you perform a calibration test that is required before using the machine?
Is the drive shaft switched on (to ensure that blower is operating)?
Is the hydraulic system of the tractor activated?
Was the boom folded out and positioned with an incline?
Was the automatic section control activated?
Was the automatic control unit of the boom activated?
8.6.1 Spreading operation
u
Switch on the universal drive shaft.
u
If required, switch on the sections manually or automatically in the electronic control unit.
u
Check the inclination of the boom.
w
See 8.5 Manual adjustment of the boom
u
Switch to the working screen.
u
Press the Spreading ON/OFF
function key.
The spreading starts.
Exclusively spread the fertilizer on the field in according with your track system until
the end.
Switch your sections to prevent overfertilizing the border zones.
u
Press the Spreading ON/OFF function key
.
u
Switch off the universal drive shaft at the tractor.
The blower stops.
u
Stop the tractor in the track in a place that is as level as possible.
When the boom is folded out and in the operating position, the baffles must be inserted into the upper
brackets on all bends.