If you want to keep the previously stored turns/kg, press the back button.
7.3 Assembling the metering unit
Fig. 42: Assembling the air duct
u
Lift and secure the air ducts.
u
Secure the air ducts with the lever [2] for the bracket.
u
Unlock the locking mechanisms [3] of the pressure chamber safety catches.
u
Use the control lever [4] to move the pressure chambers onto the air duct.
The machine is ready for spreading operation.
7. Calibration
AERO GT 60.1 5903494
69