EasyManua.ls Logo

Rauch AERO GT 60.1 - Assembling the Metering Unit

Rauch AERO GT 60.1
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
If you want to keep the previously stored turns/kg, press the back button.
7.3 Assembling the metering unit
Fig. 42: Assembling the air duct
u
Lift and secure the air ducts.
u
Secure the air ducts with the lever [2] for the bracket.
u
Unlock the locking mechanisms [3] of the pressure chamber safety catches.
u
Use the control lever [4] to move the pressure chambers onto the air duct.
The machine is ready for spreading operation.
7. Calibration
AERO GT 60.1 5903494
69

Table of Contents

Related product manuals