ü
The PT
O shaft is switched off.
ü
The holding-down clamp of the ball coupling is open.
u
Start the tractor.
u
Position the tractor at the machine.
u
Precisely position the ball coupling of the tractor under the coupling bracket of the machine.
u
Pull the hand brake of the tractor.
u
Open the valve on the support stand until the ball coupler is resting on the ball head.
The support stand is retracted automatically. See 6.7.2.3 Folding away the support stand
u
Close the valve on the support stand.
u
Switch off the tractor engine. Remove the ignition key.
u
Close the holding down clamp.
w
Please refer to the instructions of the tractor manufacturer.
The connection is secured.
n
Pin coupling
ü
The PTO shaft is switched off.
ü
The hydraulic system is switched off.
ü
The pin coupling is open.
u
Start the tractor.
u
Position the tractor at the machine.
w
Make sure there is enough space between the tractor and the machine in order to be able to
connect the drives and control elements.
u
Pull the hand brake of the tractor.
u
Switch off the tractor engine. Remove the ignition key.
u
Hang the towing eye into the tractor's pin coupling.
u
Close the coupling pin.
w
Please refer to the instructions of the tractor manufacturer.
The connection is secured.
6. Commissioning
52
5903494 AERO GT 60.1