EasyManua.ls Logo

Rauch AERO GT 60.1 - Page 60

Rauch AERO GT 60.1
146 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
u
Carefully climb the steps up to the platform.
Use the handrails.
u
Check the filling level using the inspection window
.
Only step up it if the following preconditions are fulfilled:
The folding steps are folded out downwards.
During transport and while spreading with the machine, the folding steps must always be folded
up and locked.
n
Folding in the steps in transport position
u
Fold up the folding steps [2].
u
Press
the steps against the lever [1] until it
engages firmly.
Fig. 32: Folding in the steps
6. Commissioning
60
5903494 AERO GT 60.1

Table of Contents

Related product manuals