EasyManua.ls Logo

REI OSCOR Blue - Page 46

REI OSCOR Blue
123 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
OPERATION
39
Note: After performing the Merge Peak function, Trace ‘A’ will be closed and the resulting, merged
trace will be opened in the same storage slot.
To merge two stored peak traces:
1. Select “Merge Peak” from the Traces | Stored Sub-Menu
2. Select the stored traces to be merged
After a few seconds the merged trace will be listed as “Unsaved”. Use the Save icon found in the Traces
| Stored Sub-Menu to save the newly merged trace.
If desired you can open and compare traces ‘A’ (labeled P1) and ‘B’ (labeled P2) to the merged trace to
see the resulting merged peaks as shown below:

Table of Contents

Related product manuals