EasyManua.ls Logo

Ricoh pro c901 - Page 121

Ricoh pro c901
586 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Technical Bulletin PAGE: 6/11
Model: AG-P1 / C1 Date: 20-Apr-11 No.: RM077024
Step 1-4. Move the Pulley, Timing Pulley, and Retaining Ring from the current Transport Roller to
the modified Transport Roller.
Step 1-5. Follow steps ‘1-1’ to ‘1-3’ in reverse order to install the Transport Roller, and re-install the
Timing Belt, Tightener Pulley, and Knob. Leave the transport unit drawn out.
Sliding the Rollers
Old
New

Table of Contents

Other manuals for Ricoh pro c901

Related product manuals