Technical Bulletin PAGE: 7/11
Model: AG-P1 / C1 Date: 20-Apr-11 No.: RM077024
Replacement Procedure: Transport Roller & Spring
Modification Kit:
M3799901 MODIFICATION KIT: BUFFER PASS
Step 2-1. Remove the four screws on the Guide Plate Cover and the Release Grip.
Step 2-2. Open the Guide Plate Cover, and lift it up to remove it.
Step 2-3. Replace the two Transport Roller Springs with the modified Transport Roller Springs.
Step 2-4. Put back the Guide Plate Cover and Release Grip in their original positions.
Release Grip
Two sets of transport roller springs
are installed in the top and bottom
positions.
Only replace the springs installed in
the top position.