304 Rockwell Automation Publication 1769-UM021I-EN-P - May 2018
Chapter 12 Use a Secure Digital Card
6. Click Load.
A dialog box prompts you to confirm the load.
7. To load the project, click Yes.
8. Click OK.
After you click Load, the project is loaded into the controller as indicated by
the controller status indicators. These conditions can exist:
•While the load is in progress, the following occurs:
– The controller resets itself.
When the controller is resetting itself, the status indicators execute a
sequence of state changes, for example, a brief time with the OK
status indicator in the solid red state. Wait for the controller to
complete the sequence.
– After the controller fully resets itself, the OK indicator is solid green.
– The SD indicator is off.
Project that is on the memory card of the controller (if
any project is there).
Project that is in the user memory of the
controller.