EasyManua.ls Logo

Rohde & Schwarz R&S VENICE S800/824-G3 - Installing the System

Rohde & Schwarz R&S VENICE S800/824-G3
182 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Loading...
Installation and Configuration
Installing the System
R&S VENICE S
72
User Manual | 2906.2506.02 - 01
Installing the System
Perform the following steps:
1.
Unpack the R&S VENICE S system and its accessories.
2. Check your delivery and compare it with the delivery note. In case of
missing items, contact your local vendor or Rohde & Schwarz immedi-
ately.
3. Place the system on a firm, flat surface within reach of a power outlet or
mount it in a rack. For proper air circulation and cooling make sure the
ventilation holes on the rear of the system are not covered.
Warranty Claims
To make warranty claims you have to keep the original
packing and use it in case of a return transportation.
Source of Danger
Improper handling of the VENICE S can cause substantial damage to
personnel and equipment by falling or overturning.
VENICE S must be lifted and carried by two people on both sides.
It is preferable to use lifting devices and means of transport.
Beware of the crushing hazard when working with heavy loads.

Table of Contents