EasyManuals Logo

Rotax 125 MAX evo Installation Instructions And Operation Manual

Rotax 125 MAX evo
Go to English
100 pages
To Next Page IconTo Next Page
To Next Page IconTo Next Page
To Previous Page IconTo Previous Page
To Previous Page IconTo Previous Page
Page #70 background imageLoading...
Page #70 background image
ROTAX 125 MAX evo, Junior MAX evo, Mini MAX evo, Micro MAX evo
12. Finishing work
To warrant engine operation within temperature limits of the coolant a thermo-sensor for
observation of the coolant temperature is required.
Note: Refer to Operator’s Manual (section 3.1) for limits of operation regarding coolant
temperature.
12.1. Venting of the gear compartment
Remove cap from the venting screw.
With an appropriate length of the supplied fuel hose establish connection between
venting screw and a collecting reservoir.
Note: The venting hose must not reach all the way to the bottom of the collecting
reservoir.
Warning: Before engine operation, read the Operator’s Manual.
Seite/page 69/98
Ausgabe/Edition 11/2014

Table of Contents

Other manuals for Rotax 125 MAX evo

Questions and Answers:

Question and Answer IconNeed help?

Do you have a question about the Rotax 125 MAX evo and is the answer not in the manual?

Rotax 125 MAX evo Specifications

General IconGeneral
BrandRotax
Model125 MAX evo
CategoryEngine
LanguageEnglish

Related product manuals